Tuesday 26 June 2012

Plasters Up, Downpipes In

So stuff is continuing to happen. We have the walls plastered, and they are patching up all the holes etc at the moment. Downpipes have been put in also. A few photos of everything is below.

Upstairs Area

Charli in the hallway & the laundry with the little cabinet where all my network cabling etc will run back too.

Downpipes.


Showers in the ensuite and bathroom with the shadow boxes (or whatever they should be called) where we can keep shampoo etc. The ensuite box is the full width of the back of the shower and the back of the box will be tiled in a different colored tile.




Recessed box in the main bedroom so the powerpoint and aerial can be easily hidden behind the TV & The study looking out to the street. What a pointless photo :-)

1 comment:

  1. Hey Col,

    Thats a really good idea to have a recess in the wall behind where the flatscreen will be mounted.

    Regards
    Brad

    ReplyDelete