We have some pipes in the ground. Friday afternoon they finished putting all the drainage and house plumbing pipes in.

2 photos above show the block as it was Thursday afternoon. The ones lines is sand to show where the drainage pipe points and house plumbing needed to be dug and installed in the ground.


And as of Friday afternoon, this is the plumbing in the ground.

Hopefully sometime this week we should have a slab. That will be really interesting. The split level means there will be 2 levels, and im intrigued to see the difference between the 2 living levels, and even the garage.

Oh.. and we now have a porta potty on our block :-)